Request a survey

WaterLocation / Answers

Updated 2026-10-23

3 gpm or 30 gpm? How to read pump tests and define sustainable yield

Plan with the rate the well actually held through the pumping test, converted to m³ per day: 30 US gpm is about 164 m³/day, 3 gpm only about 16. WaterLocation forecasts the yield before drilling and checks it with the pumping test; tested results on its projects include 648 m³/day in Catalonia (official state test) and 864 m³/day (10 l/s) in Altmannstein, Bavaria.

Which number from the test is my sustainable yield?

Use the on‑site pumping test result that was actually maintained and recorded, and plan in m³ per day. This is the number WaterLocation uses in reports and in post‑drilling verification. Examples include 648 m³/day in Catalonia (confirmed by the official state test), about 200 m³/day in the Kalahari, more than 300 m³/day in Ulrichstein, and 864 m³/day (10 l/s) in Altmannstein.

If your sheet only shows a minute‑based number (e.g., in gpm), ask your driller to state the tested daily volume so you can compare it with your farm, resort or municipal demand.

How to read a pump test sheet without unit mix‑ups

  • Identify the tested rate (the discharge the crew held during the test) and the unit used.
  • For planning, write the same rate in m³ per day; this is how WaterLocation reports yields and compares them to demand.
  • Keep the test record with the measured water level and rate together; this is the reference for pump sizing and operating limits.
  • Before drilling, a survey can state the forecast yield in m³/day; the pumping test then compares the real yield with the forecast. See predict borehole yield.

Quick unit conversion

Pump test figurePer day
3 US gpm≈ 16 m³/day
30 US gpm≈ 164 m³/day
1 litre per second86.4 m³/day
10 litres per second864 m³/day

1 US gallon = 3.785 litres; a day has 1,440 minutes.

Tested yields from real sites

SiteBeforeTested resultYield
Catalonia, Spain (deep clay)Several failed boreholesWater at 136 m; state test648 m³/day
Altmannstein, Germany (limestone)Old well 2 l/s; needed 10 l/sWater at 88 m864 m³/day (10 l/s)
Ulrichstein, Germany (basalt)All earlier boreholes failed; demand 260 m³/day≈200 m well; static level 87 m300+ m³/day
Kalahari, South Africa (rock and quartz)25 boreholes; 4 steady150 m; static level 28 m≈200 m³/day
Namibia, Kalahari (dolomite)9 wells; 1 steady year‑roundTwo new wells at 21 m and 57 m100 and 350+ m³/day
Mitterfirmiansreut, Germany (granite)4 empty holes up to 118 mWater at 22 m200 m³/day

What if the test and my target don’t match?

  • Survey before redrilling: on sites with dry or low‑yield holes, a fracture survey can site a new point with a forecast yield and depth. See dry borehole: what next and borehole siting methods.
  • Result verification: WaterLocation ties its discovery fee to the pumping test result; if a borehole drilled at the specified point and depth doesn’t deliver, there is no discovery fee. See pay only if water is found.
  • Hard‑rock caution: in granite, basalt and dolomite, yield depends on narrow fractures; a hole a few metres off can underperform. See hard‑rock borehole yield.

There are no guaranteed results; every site is different and yields are quoted per site.

Sources

Questions

What unit should I plan with: gpm or m³/day?

WaterLocation plans and reports in m³ per day. To convert: multiply US gpm by 5.45 to get m³/day (30 gpm ≈ 164 m³/day), or litres per second by 86.4 (10 l/s = 864 m³/day).

How is yield confirmed?

By an on‑site pumping test compared with the forecast; in Catalonia the official state pumping test confirmed 648 m³/day.

Can you estimate sustainable yield before drilling?

Yes. A survey report gives the point, depth and forecast m³/day; the pumping test then compares the real yield with the forecast.